Section 112

  1. Emergency lighting system working with batteries should be provided in the projection room and auditorium and in case of any failure of the electric supply the emergency light should be switched on immediately.
  2. The wiring for lighting should be done in conduit system and all cables should be enclosed in screwed metal conduits connected to the earth. The conduits should be firmly fixed with proper saddles and clips.
  3. The cables used for wiring the light circuit inside the projection room, auditorium, etc. should not be of size less than 2.5 sq.m. (1/1.8) or its equivalent.
  4. Cables with two insulations (sheathing and insulation) or one insulation and weather-proof braiding should be used for wiring in auditorium and projection room.
  5. When tappings are to be taken from any point of the wiring, junction boxes shall be provided and proper size of connector shall be used.
  6. When separate over-head lines are drawn for outdoor lighting the lines shall be drawn on strong wooden posts with at least wooden cross arms or spacers and weather proof wires of size not less than 2.5 sq.mm. shall be used.
  7. Except in Panchayat areas no loud speakers shall be fitted outside the auditorium.
  8. In all cinema theatres licensed as Air Conditioned Theatres, standby power supply of adequate capacity, as determined by the Chief Electrical Inspector to Government or his nominee in conformity with I.S.I. Standards, shall be installed to ensure adequate circulation of cooled fresh air. The temperature, the velocity of movement and the humidity of the air as well as the proportion of fresh air in the circulated air shall conform to the standards prescribed by the Chief Electrical Inspector to Government or his nominee.
  9. In all cinema theatres licensed as Air Conditioned Theatres, separate metering shall be provided to measure the energy consumed by the air conditioning system, consisting of the compressors, pumps, air handling units and the air circulating system, if any. This energy meter shall be read every hour during the show and the readings recorded by the operator in the register prescribed for the purpose by the Chief Electrical Inspector to Government or his nominee. The AC. System shall be commissioned before the show begins and shall continue to function till the show ends including the interval if any.
  10. The Licensee shall be responsible for the proper maintenance of the electrical installation including the air conditioning system as well as for the maintenance of the register prescribed for the purpose.